Tuesday, June 14, 2011

Loading at last
















At 12pm we got the call to come to the ship, there were lots of boats already loaded. We came along side and a diver went under the boat to check where the straps should go. An engineer came on to check that everything was safely stowed on our boat. We then climbed off onto a small boat and left her. It would take a few hours to load SeaWolff as there were other boats to load first. They lift the boats onto the deck and put metal poles with flat pads under the hulls. These are welded onto the ship. Yellow straps are then used to tie the boat to the ships deck as well.
We decided to go and leave everything in the hands of the experts. We will see the ship in Singapore on about the 21st July. I will resume the entries then.




No comments:

Post a Comment